- Full rip out including electrics and under floor heating
- First fix plumbing and electrical work
- Board and skim to ceiling
- Shower block wall had to be bantered an cement boarded for make room for the concealed shower unit
- Underfloor heating with new thermostat added
- Full tile floor to ceiling and tiled bath panel
- All new toilet, vanity unit and shower bath with screen and concealed shower valves
- New door casing, door and architrave added