Full rip out of old bathroom suit, tiles and flooring.
I extended the stud wall into the large landing to fit a large shower area to the bathroom. Both door casings into the bathroom and bedroom needed to be replaced.
Full plaster to walls and ceilings.
I deigned and installed an internal stud wall to the bathroom, to divide the bath+shower including recessed tile shelving.
Tile installation to bath, shower and floor area.
With bespoke vanity sink unit and storage cupboard manufactured by myself, with matching bath panel.